NOTE:
Some years only small projects are undertaken in order to accumulate funds for larger projects during subsequent years.
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| 2024 | Yearly Total | $531,044 | ||
| Feb. 2024 | Dead Tree Removal | Hilltop Tree Service | $2,850 | 7300 Block, Crystal |
| March 2024 | Pothole Patch | Joe Vicini, Inc. | $3,984 | 6600 Block, Crystal |
| April 2024 | Weed Abatement | Evergreen Turf & Tree Care | $3,800 | |
| April 2024 | Vegetation Management | Cal Fire Growlersburg, Burnor Outdoor Svcs. | $954 | Crystal Ditch |
| May 2024 | Vegetation Management | Cal Fire Growlersburg, Burnor Outdoor Svcs. | $954 | Dolomite @ Manganite |
| May 2024 | Crystal Ditch Cleaning | Doug Veerkamp General Engineering, Inc. | $34,650 | Crystal Curve to County Road |
| June 2024 | Vegetation Management | Hilltop Tree Service | $12,850 | Overhead clearance, Crystal |
| June 2024 | Drainage Reconstruction | Joe Vicini, Inc. | $20,345 | Repair/fortify drop-inlet culvert and catch basin, 6300 block, Crystal |
| July 2024 | Crystal Asphalt Overlay | Doug Veerkamp General Engineering, Inc. | $413,528 | Obrizo, 1 mile north |
| August 2024 | Vegetation Management | Cal Fire Growlersburg, Wilkinson Portables | $2,127 | Common Area |
| Nov. 2024 | Weed Abatement | Evergreen Turf & Tree Care | $4,050 | |
| Dec. 2024 | Road Patches | Joe Vicini, Inc. | $4,224 | Manganite pavement repair |
| Dec. 2024 | Crack Sealing | Wilson's Asphalt | $4,375 | Crystal Blvd. |
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| 2023 | Yearly Total | $23,030 | ||
| Jan. 2023 | Storm Repairs | Veerkamp General Engineering | $10,495 | Drainage Repairs |
| April 2023 | Weed Abatement | Excel Tech | $3,800 | |
| July 2023 | Drop Inlet Grates | Wesely Mobile Welding | $4,935 | Fabricate and Install Two Drop Inlet Grates |
| Nov. 2023 | Weed Abatement | Excel Tech | $3,800 |
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| 2022 | Yearly Total | $7,600 | ||
| April 2022 | Weed Abatement | Excel Tech | $3,800 | |
| Nov. 2022 | Weed Abatement | Excel Tech | $3,800 |
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| 2021 | Yearly Total | $7,600 | ||
| April 2021 | Weed Abatement | Excel Tech | $3,800 | |
| Nov. 2021 | Weed Abatement | Excel Tech | $3,800 |
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| 2020 | Yearly Total | $335,975 | ||
| May 2020 | Paving | Veerkamp Gen Eng | $260,489 | Mica to Obrizo 2" Asphalt Overlay |
| May 2020 | Paving | Veerkamp Gen Eng | $38,491 | Mica to Obrizo Striping |
| May 2020 | Paving | Veerkamp Gen Eng | $5,500 | Mica to Obrizo Pave Mailbox Turnouts |
| May 2020 | Hydrant Markers | Veerkamp Gen Eng | $560 | District-Wide Install Blue Markers |
| May 2020 | Drainage | Veerkamp Gen Eng | $24,335 | Dolomite Shift Shoulder |
| May 2020 | Weed Abatement | Excel Tech | $2,800 | |
| November 2020 | Weed Abatement | Excel Tech | $3,800 |
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| Nov. 2019 | Weed Abatement | Excel Tech | $3,800 |
| Date | Project | Vendor | Cost | Notes |
|---|---|---|---|---|
| June 2018 | Weed Abatement | Excel Tech | $2,800 |