Road Projects 2018 and Later:

NOTE:
Some years only small projects are undertaken in order to accumulate funds for larger projects during subsequent years.

Projects 2023  (Previous Years Below)
Date Project Vendor Cost Notes
2023 Yearly Total $23,030
Jan. 2023 Storm Repairs Veerkamp General Engineering $10,495 Drainage Repairs
April 2023 Weed Abatement Excel Tech $3,800
July 2023 Drop Inlet Grates Wesely Mobile Welding $4,935 Fabricate and Install Two Drop Inlet Grates
Nov. 2023 Weed Abatement Excel Tech $3,800



Projects 2022  (Previous Years Below)
Date Project Vendor Cost Notes
2022 Yearly Total $7,600
April 2022 Weed Abatement Excel Tech $3,800
Nov. 2022 Weed Abatement Excel Tech $3,800



Projects 2021  (Previous Years Below)
Date Project Vendor Cost Notes
2021 Yearly Total $7,600
April 2021 Weed Abatement Excel Tech $3,800
Nov. 2021 Weed Abatement Excel Tech $3,800



Projects 2020  (Previous Years Below)
Date Project Vendor Cost Notes
2020 Yearly Total $335,975
May 2020 Paving Veerkamp Gen Eng $260,489 Mica to Obrizo
2" Asphalt Overlay
May 2020 Paving Veerkamp Gen Eng $38,491 Mica to Obrizo
Striping
May 2020 Paving Veerkamp Gen Eng $5,500 Mica to Obrizo
Pave Mailbox Turnouts
May 2020 Hydrant Markers Veerkamp Gen Eng $560 District-Wide
Install Blue Markers
May 2020 Drainage Veerkamp Gen Eng $24,335 Dolomite Shift Shoulder
May 2020 Weed Abatement Excel Tech $2,800
November 2020 Weed Abatement Excel Tech $3,800



Projects 2019  (Previous Years Below)
Date Project Vendor Cost Notes
Nov. 2019 Weed Abatement Excel Tech $3,800



Projects 2018
Date Project Vendor Cost Notes
June 2018 Weed Abatement Excel Tech $2,800