Golden West Community Services District
2016 Projects:
- Ditch Maintenance
- Contractor: Tim Land
- Scope of Work: Sites on Dolomite, Manganite, and Galena in Unit 2 and Crystal Blvd., Calcite, Barite and Sodalite South in Unit 5 were selected based on need.
- Cost: $24,530
- Completed: February 16, 2016
- Phase 2: Ditch Maintenance
- Contractor: Tim Land
- Scope of Work: Additional ditch work on Crystal Blvd. Sodalite and Amalgam
- Cost: $12,0000
- Completed: May, 2016
- Roadside Weed Abatement
- Contractor: All Green Landscape Solutions
- Scope of Work: All District roadsides were given two applications of herbicide.
- Cost: $5,213
- Completed: 1st Spray application February 27th, 2nd Spray application July 10th
- Hot Crack Seal
- Contractor: Sierra Striping Inc.
- Scope of Work: Seal cracks in asphalt on Calcite, Crystal Blvd. and Dolomite.
- Cost: $3,125
- Completed: May 2016
- Amalgam Overlay
- Contractor: Joe Vicini, Inc.
- Scope of Work: Remove approximately 9000 square feet of old chip seal and replace with 2 inch thick AC with embedded fiber.
- Cost: $21,650
- Completed: May 27, 2016
- Barite Encroachment
- Contractor: Joe Vicini, Inc
- Scope of Work: Grade, compact and surface with a minimum of 2-1/2 inches compacted AC material on an approximately 395 lineal feet by 18 foot wide section of Barite encroachment onto Crystal Blvd.
- Cost: $26,480
- Completed: September 27th, 2016
- South Crystal Blvd and Calcite Crack Seal and Patch
- Contractor: Doug Veerkamp General Engineering Inc.
- Scope of Work: Blow out cracks with compressed air and seal with hot rubberized asphalt. Dig out and replace sections of roadway showing extensive damage and serious potholes in preparation for installing engineered fabric in 2017.
- Cost: $69,060
- Completed: September 2016
-
- Hot Crack Seal
- Contractor: Concrete Pavement Maintenance
- Scope of Work: Seal ahphalt cracks on Galena and Central Crystal Blvd.
- Cost: $6,900
- Completed: October 2016