Golden West Community Services District
2015 Projects:
- Tree Trimming
- Contractor: Hilltop Tree Service
- Scope of Work: Trim trees over district roads as specified.
- Cost: $6,400
- Completed: February 2015
- Drain Ditch Repairs
- Contractor: Joe Vicini, Inc.
- Scope of Work: Culvert repair at a site on Crystal and another on Sodalite; replace a culvert on Crystal.
- Cost: $4,510
- Contract date: April, 11 2015
- Pothole and Shoulder-Backing Repairs
- Contractor: Doug Veerkamp General Engineering Inc.
- Scope of Work: Pothole Repairs: 1,400 sq ft on Crystal, 50 sq ft on Manganite, 600 sq ft on Pyrite. Shoulder backing on Crystal.
- Cost: $22,000
- Contract date: June 13, 2015
- Roadside Weed Abatement
- Contractor: All Green Landscape Solutions
- Scope of Work: All District roadsides were given two applications of herbicide.
- Cost: $4,500
- Completed: First Phase in March, Second Phase in June
- Crystal Curve Drainage
- Contractor: Gordon Vicini, Inc.
- Scope of Work: The drainage at the S-curve 1/4 mile in on Crystal Blvd. has been a perennial problem with frequent flooding resulting in a hazard to drivers and damage to the roadway. This problem was mitigated by installing a dropped culvert, paving the ditch to prevent erosion and installation of bright fog line markers.
- Cost: $21,915
- Completed: ?-2015
- Drop Culverts
- Contractor: Gordon Vicini, Inc.
- Scope of Work: Drop culvert openings with grates and side inlets were installed on District culverts at 7120 Calcite and 7389 Crystal Blvd. These installations will minimize the chance of plugging and road damage.
- Cost: $2,900